Modoc Nation Request for Proposals
No requests at this time.
Date: 11-12-2026
PROJECT: HUD-ICDBG Award # 23GC4020380
Training Community Center
Modoc Nation is soliciting proposals from qualified Design-Build teams for the design and construction of a Training Community Center located at 60715 E. 100 Road, Miami, Oklahoma 74354. Responses will be evaluated based on qualifications, experience, project approach, understanding of project requirements, and the ability to successfully deliver the project within established budget and schedule constraints.
The project consists of an approximately 8,300-square-foot facility with a 250-square-foot interior safe room, approximately 1,200 square feet of sidewalk, and approximately 1,000 square yards of parking. The facility is anticipated to utilize wood-frame construction with brick exterior finishes and vinyl windows. The selected Design-Build team shall provide all labor, supervision, design services, quality control, materials, supplies, equipment, and all other resources necessary to complete the project.
The Design-Build Contractor shall be responsible for the complete project scope and shall assume responsibility for all subcontractors, consultants, suppliers, and divisions of work required for successful project delivery. Proposals should be comprehensive and reflect all work necessary to provide a complete and functional facility. Construction shall be completed within the agreed number of calendar days established at contract award, commencing upon issuance of the Notice to Proceed by Modoc Nation.
Following evaluation of proposals, Modoc Nation may establish a shortlist of the highest-ranked firms for interviews, clarifications, negotiations, or additional proposal development prior to selection. Modoc Nation reserves the right to select a Design-Build Contractor with or without interviews and to negotiate with one or more proposers in the best interest of the Nation.
This project is federally funded by the United States Department of Housing and Urban Development (HUD) through Indian Housing Block Grants under the ICDBG program. The Awarded Contractor must comply with all applicable laws, federal regulations, and requirements relating to these federal funds, including the specific ICDBG requirements found at 24 CFR Part 1003. Indian Preference: In accordance with Section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e(b)) and HUD regulations at 24 CFR §1003.510, all ICDBG projects are subject to Indian preference in employment, training, and contracting. Drug-Free and Tobacco-Free Workplace: All Modoc Nation buildings and grounds are considered drug-free and tobacco-free. The successful Design-Build Contractor shall ensure all employees, subcontractors, and other workers comply with this policy.
Build America, Buy America (BABA): This project is subject to the Buy America Preference under the Build America, Buy America Act (2 CFR Part 184) and HUD guidance. The Contractor shall ensure that all iron and steel products and specified construction materials used in the project are produced in the United States unless an authorized waiver applies. If HUD determines that this project qualifies for an applicable waiver, including a general tribal waiver or a project-specific waiver, the Buy America Preference requirements shall be waived to the extent authorized by HUD. The Contractor shall cooperate with the Owner in documenting the basis for any waiver and maintain such documentation for at least three years after project completion.
U.S. Army Corps of Engineers – Tulsa District (USACE) will review the project design, estimates, construction quality assurance activities, and pay applications for the Owner’s consideration. USACE serves in an advisory capacity to Modoc Nation and does not relieve the Design-Build Contractor of responsibility for quality control, project safety, scheduling, means and methods of construction, or contract performance.
Modoc Nation intends to award this project using a best-value procurement process. Selection will be based on qualifications, experience, project understanding, technical approach, Indian Preference, schedule, and the overall ability to successfully deliver the project. Price and the proposed Guaranteed Maximum Price (GMP) approach will be considered during negotiations and prior to final contract award. Evaluation criteria and point allocations are provided below.
• Verifiable Indian Preference for both firms (0–10 points)
• Architect’s/Engineer’s qualifications and experience with tribal projects (0–30 points)
• General Contractor’s experience with tribal nations, communication plan, site control plan, and minority subcontracting plan (0–30 points)
• Design-Build team’s experience working together (0–5 points)
• General requirements and overhead percentages (0–5 points)
• Proposed completion schedule with critical path items (0–5 points)
• Proof of insurance and ability to provide 100% payment and performance bond (0–5 points)
• Active UEI SAM.gov registration with “No Exclusions” (0–5 points)
• Approach to Guaranteed Maximum Price (GMP) and contingency plan (0–5 points)
100% payment and performance bond required. Certificate of Liability Insurance for the full contract price, naming Modoc Nation as certificate holder or additional insured, required at contracting. Design-Build lead must be registered on SAM.gov with no exclusions before contracting.
Modoc Nation reserves the right to select a Design-Build team from the responses, with or without conducting interviews. A Design-Build team will be notified with an Intent to Negotiate to produce design documents up to 35%, a guaranteed maximum price estimate, and a construction schedule prior to a fully negotiated contract. Assumptions and clarifications are to be included in the 35% contract package. If pricing and scope cannot be negotiated, Modoc Nation may release the Design-Build team and move to another contractor. The Design-Build contractor assumes risk before a fully executed contract and will fully ensure the project until the keys are handed over to the Owner.
For selection consideration, please mail or deliver SIX (6) hard copies of the RFP response/proposal, including all evaluation criteria items in order, to Modoc Nation Headquarters, 22 N. Eight Tribes Trail, Miami, OK 74354, ATTN: Ms. Francesca Smith and/ Troy Littleaxe. Hard copies must be in hand by the RFP deadline. Each RFP will be time-stamped. Email the PDF form to Francesca.smith@modocnation.com and CC: Troy.Littleaxe@modocnation.com.
Additional Project Information: Supporting project documents, including conceptual plans, utility information, environmental documentation, and consolidated questions and responses from previous project solicitations, are available upon request. RFP submissions DUE by Dec. 14, 2026, at 2:00 PM CST.